News: Bosnia and Herzegovina urgently need investment on transport infrastructure construction
A total of 68 km of existing highways in BiH, in accordance with the EU average standard, Bosnia and Herzegovina also needs to build 860 km highway.A total of 335 kilometers from north to south across the Bosnian 5C highway, currently only repair has become 42 km; 73 km is being built there, as well as 220 km to be built.
5C highway is identified on the 1997 Helsinki Conference of European part of road network. Bosnia and Herzegovina planned in 2020 to complete the highway construction, the need to invest 1.9 billion Euros in funding.
Bosnian other transportation facilities are lagging behind, such as, railways, airports, etc., although there are several programs, financial difficulties, much-needed external funding.Bosnia and Herzegovina has four airports but poor, are eager to improve their facilities, expand for pick up capabilities.For investors, this is a good opportunity.
In highway construction, laying gravel aggregate requires a lot of quality, a great need for a complete production line to provide the source of security, besides, the time when the demand for larger becomes more important.Liming Heavy Industry design large and medium impact crusher, hard rock type impact crusher, in terms of both equipped with wear-resistant material and the design principles are walking in the domestic front, fully meet the requirements.
Finally is the sand making machine, the best standard sand made of stone molding equipment manufactured by Liming Heavy Industry 5X Sand,it has a plastic material effect, produce sand grain type uniform and particles less flakiness.